Nominal output and composition of generating equipment of OAO INTER RAO UES branches in 2009:

Item DescriptionTotalSevero-Zapadnaya TETS (North-Western CHPP)Sochinskaya TES (Sochi TPS)Kaliningrad TETS-2 (Kaliningrad CHPP-2) Ivanovskiye PGU (Ivanovo CCP)
Nominal Electric Power Ouput, MW, end 20091883900158450325

All power generating units of INTER RAO UES branches are steam & gas type. The composition of generating equipment is as follows:

  • Severo-Zapadnaya TETS (North-Western CHPP): 2?PGU-450 (4?GTE-160 V- 94.2+2??-125/150-7,7);

  • Sochinskaya TES (Sochi TPS) 2?PGU-39 (2?GTU-28 GT10C + 2 ?-10/11-5,2/0,2) + PGU-80 (2?GTU-28 GT10C+?? SST400);

  • Kaliningrad TETS-2 (Kaliningrad CHPP-2): PGU-450(2?GTE-160 V- 94.2 + ?-150-7,7);

  • Ivanovskiye PGU (Ivanovo CCP): PGU-325 (2 GTE-110 + ?-110-6,5).

Compared to 2008, total power output increased due to installation of 80 MW PGU-80 power generating unit at Sochi TPS.

Energy Production

Energy Production:

PlantUnit200720082009
Ivanovskiye PGU (Ivanovo CCP)million kWh232,079652,908589,962
Kaliningrad TETS-2 (Kaliningrad CHPP-2)million kWh2578,9362688,9062528,890
Severo-Zapadnaya TETS (North-Western CHPP)million kWh3398,0014366,0256097,680
Sochinskaya TES (Sochi TPS)million kWh579,442433,721534,589
INTER RAO Totalmillion kWh6788,4588141,569751,121

Energy Production of OAO INTER RAO UES Branches in 2009 (million kWh)

Energy production increased by 19.8% compared to 2008.

Equivalent fuel consumption per unit of delivered energy:

PlantUnit200720082009
Ivanovskiye PGU (Ivanovo CCP)g/kWh287,9269,7266,6
Kaliningrad TETS-2 (Kaliningrad CHPP-2)g/kWh263,1263,7258,4
Severo-Zapadnaya TETS (North-Western CHPP)g/kWh233,0234,5237,3
Sochinskaya TES (Sochi TPS)g/kWh269,2266,9268,4
INTER RAO Totalg/kWh249,4248,7246,2

Equivalent fuel consumption per kilowatt-hour of delivered energy reduced by 2.5 g since 2008 thanks to increased average electrical load at Kaliningrad CHPP-2 and Ivanovo CCP.

Installed Power Generating Capacity Use Ratio:

PlantUnit200720082009
Ivanovskiye PGU (Ivanovo CCP)%8,9122,8720,72
Kaliningrad TETS-2 (Kaliningrad CHPP-2)%65,4268,0364,15
Severo-Zapadnaya TETS (North-Western CHPP)%43,155,2377,34
Sochinskaya TES (Sochi TPS)%84,863,374,08
INTER RAO Total%44,9252,8763,34

Installed Power Generating Capacity Use Ratio (%):